A Work Cell Is Required to Make 140 Computerized Diagnostic

question 16

Essay

A work cell is required to make 140 computerized diagnostic assemblies (for installation into hybrid automobiles) each day. The cell currently works an eight hour shift, of which seven hours is available for productive work. These assemblies require five operations. Standard times for these operations are: Operation A, 3.0 minutes, B, 1.8 minutes, C, 2.4 minutes, D, 2.5 minutes, and E, 1.4 minutes. What is takt time for this cell? How many workers will be needed to achieve this schedule? Use the grid below to construct a work balance chart for this cell. A work cell is required to make 140 computerized diagnostic assemblies (for installation into hybrid automobiles) each day. The cell currently works an eight hour shift, of which seven hours is available for productive work. These assemblies require five operations. Standard times for these operations are: Operation A, 3.0 minutes, B, 1.8 minutes, C, 2.4 minutes, D, 2.5 minutes, and E, 1.4 minutes. What is takt time for this cell? How many workers will be needed to achieve this schedule? Use the grid below to construct a work balance chart for this cell.


Definitions:

Precipitation

The process by which water vapor in the atmosphere condenses into droplets or ice crystals that fall to the Earth's surface, contributing to the hydrological cycle.

Evaporation

The process by which water is transformed from a liquid to a gas or vapor state, often contributing to the hydrologic cycle by removing moisture from bodies of water, soil, and other surfaces.

Granite Bedrock

The solid rock layer under the soil composed primarily of granite, a coarse-grained igneous rock consisting mainly of quartz, mica, and feldspar.

Spheroidal Weathering

A form of mostly chemical weathering in which concentric or spherical shells of decayed rock are successively separated from a block of rock.

Related Questions