All major decisions and authority are under the control of the project manager in a:


Definitions:

Break-Even

The juncture where the sum of all revenues is equivalent to the sum of all costs, leading to neither a profit nor a loss.

Fixed Costs

Costs that do not change with the level of output or sales within a certain period of time.

Break-Even Point

The production level or sales volume at which total revenues equal total expenses, resulting in zero profit or loss.