Examlex
Table 7.2
A manufacturer using a kanban system has had problems with high inventory levels of one of the component parts it makes. Daily demand for the part is 3000 units, average waiting time during production is 0.20 day, processing time is 0.10 day per container, and a container holds 150 pieces.
-Use the information in Table 7.2.How many kanban containers would be required if a 10 % efficiency factor is used?
Q2: Deviations from the project plan are often
Q2: Use the information from Table 9.1.If the
Q17: The Delphi method is a process of
Q46: Aggregating products or services together generally decreases
Q53: A(n)_ is a card used to control
Q56: A weighted moving average method that calculates
Q63: A(n)_ line is a product line that
Q86: A discount store is experiencing an
Q123: _ is the maximum length of time
Q173: Whose philosophy of quality management focused on