You Have Been Called in as a Consultant to Set

question 22

Multiple Choice

You have been called in as a consultant to set up a kanban control system. The first thing to do is to determine the number of kanban card sets needed. Your research shows that the expected demand during lead time for a particular component is 150 per hour. You estimate the safety stock should be set at 25 percent of the demand during lead time. The tote trays used as containers can hold 8 units of stock, and the lead time it takes to replenish an order is 2 hours. You found that the number of kanban cards needed is 47. Your client now tells you that they miscalculated the demand and the true demand is 300 per hour. All other things remain the same. What is the most appropriate answer from the choices below?


Definitions:

Rapid City Flood

A catastrophic flood event that occurred in Rapid City, South Dakota, in 1972 due to heavy rainfall.

Flash Flood

A local and sudden flood of short duration, such as that which may follow a brief but heavy rainfall.

Global Warming

Increasing global atmospheric and oceanic temperatures as measured or inferred from some point in the past to the present.

Lithosphere

The rigid outer layer of the earth, including the crust and upper mantle, which is divided into tectonic plates.

Related Questions