Assume that an assembly line has three tasks that must be completed (in order, A, B, and C) . The tasks have processing times of 9, 9, and 11 minutes per unit, respectively. If the assembly operates for 400 minutes per day with a desired output of 70 units per day, what is the efficiency of the assembly line?


Definitions:

Six Sigma

A set of techniques and tools for process improvement aiming at reducing defects and variability in manufacturing and business processes.

Rigours Data Analysis

An in-depth and meticulous approach to examining and interpreting data to uncover meaningful insights, patterns, and relationships.

Product Life Cycle

The sequence of stages that a product goes through from introduction to growth, maturity, and decline in the market.

Preliminary Design

Preliminary design is the initial phase in the design process, focusing on outlining the basic concept, specifications, and feasibility of a project before detailed planning begins.