TABLE 17-8 Recently,a University Switched to a New Type of Computer-Based Registration.The

question 111

Short Answer

TABLE 17-8
Recently,a university switched to a new type of computer-based registration.The registrar is concerned with the amount of time students are spending on the computer registering under the new system.She decides to randomly select 8 students on each of the 12 days of the registration and determine the time each spends on the computer registering.The range,mean,and standard deviation of the times required to register are in the table that follows.
TABLE 17-8 Recently,a university switched to a new type of computer-based registration.The registrar is concerned with the amount of time students are spending on the computer registering under the new system.She decides to randomly select 8 students on each of the 12 days of the registration and determine the time each spends on the computer registering.The range,mean,and standard deviation of the times required to register are in the table that follows.    -Referring to Table 17-8,an   chart is to be used for the time required to register.The center line of this chart is located at ________.
-Referring to Table 17-8,an TABLE 17-8 Recently,a university switched to a new type of computer-based registration.The registrar is concerned with the amount of time students are spending on the computer registering under the new system.She decides to randomly select 8 students on each of the 12 days of the registration and determine the time each spends on the computer registering.The range,mean,and standard deviation of the times required to register are in the table that follows.    -Referring to Table 17-8,an   chart is to be used for the time required to register.The center line of this chart is located at ________. chart is to be used for the time required to register.The center line of this chart is located at ________.


Definitions:

Job Lateness

The amount of time by which the completion of a job exceeds its originally scheduled or planned delivery time.

Machine Centre

A specific location or unit within a manufacturing facility where machines perform particular functions or operations.

Sequence

A specific order in which related events, movements, or things follow each other.

Throughput Time

The time it takes for a product to go through the production process with no waiting. It is the time of the longest path through the system.