Scenario E.1
SimQuick is being used to simulate the following bank process:
Customer arrivals at the Entrance Door of the bank with an average time between arrivals of 2.5 minutes. The Line Buffer holds 6 customers. If a customer arrives and the buffer line is filled, the customer leaves. The Work Station Teller's processing time per customer is normally distributed, with a mean of 3.0 minutes and a standard deviation of 0.5 minutes. The Served Customer Buffer in the flow chart is used to count the number of customers processed during the period simulated. A 2-hour period was simulated.
The SimQuick simulation is run, and the results are as follows:
-Use the information in Scenario E.1. On average, approximately how many customers were waiting in line during the 2-hour simulation period?
Constructive Dilemma (CD)
A logical argument asserting that if P implies Q and R implies S, and either P or R is true, then either Q or S must be true.
Atomic Sentences
The simplest type of sentence that cannot be broken down into smaller components while still expressing a complete proposition.
Truth Table
A mathematical table used in logic to determine whether a compound statement is true or false, depending on the truth values of its components.
Modus Tollens (MT)
A form of logical argument that concludes the inverse of an antecedent from the negation of its consequent in a conditional statement.
Q5: Keith assembles peanut valves and the recorded
Q15: Comment on the tension between cost management
Q24: NYNEX must schedule round-the-clock coverage for its
Q43: _ is a feature of simulation models
Q49: Use the information in Table J.15. If
Q73: The _ problem is a one-period type
Q83: Which one of the following actions will
Q90: A super computer-accessory discount store often has
Q101: The sum of scheduled receipts for all
Q314: Referring to Table 19-2,what is the optimal