Auto Data produces custom engineering testing equipment. The following six jobs are currently in the design department. The time since each one arrived, the processing time, and the due date are shown below. All times are expressed in terms of days. Let now be the beginning of Day 1.
Table J.8 Auto Data produces custom engineering testing equipment. The following six jobs are currently in the design department. The time since each one arrived, the processing time, and the due date are shown below. All times are expressed in terms of days. Let now be the beginning of Day 1.    -Using the information in Table J.8 and the FCFS rule, what is the average days past due? A)  fewer than or equal to 5.0 days B)  greater than 5.0 days but fewer than or equal to 8.0 days C)  greater than 8.0 days but fewer than or equal to 9.0 days D)  greater than 9.0 days
-Using the information in Table J.8 and the FCFS rule, what is the average days past due?


Definitions:

Cashmere Sweater

A cashmere sweater is a luxurious garment made from the soft undercoat of the cashmere goat, known for its warmth, lightness, and softness.

Cumulative Discounts

Price reductions based on the volume or quantity of items purchased over time.

Noncumulative Discounts

Price reductions that are offered on a one-time basis and do not accumulate over time or through additional purchases.

Inventory Carrying Costs

The expenses associated with holding and storing unsold goods or materials, including warehousing, insurance, and spoilage.