Examlex
Table 5.3
King Supply makes four different types of plumbing fixtures: W, X, Y and Z. The contribution margins for these products are: $70 for Product W, $60 for Product X, $90 for Product Y and $100 for Product Z. Fixed overhead is estimated at $5,500 per week. The manufacture of each fixture requires four machines, Machines #1, 2, 3 and 4. Each of the machines is available for 40 hours a week and there is no setup time required when shifting from the production of one product to any other. The processing requirements to make one unit of each product are shown in the table. Weekly product demand for the next planning period has been forecasted as follows: 70 Ws, 60 Xs, 50 Ys and 30 Zs.
In the questions that follow, the traditional method refers to maximizing the contribution margin per unit for each product, and the bottleneck method refers to maximizing the contribution margin per minute at the bottleneck for each product.
-Use the information in Table 5.3. Which machine is the bottleneck operation?
Q6: Toyota sets up all of its operations
Q11: Champion Cooling Company uses a kanban system
Q17: Benchmarking studies must have:<br>A) a direct competitor
Q18: The transition from economies of scale to
Q20: What are the supply chain implications of
Q40: The electricity bill at Padco was driven
Q64: A linear regression model is developed that
Q105: An expansionist capacity strategy involves large, infrequent
Q136: A line that produces several items belonging
Q163: Kaizen is the Japanese term for continuous