Examlex

Solved

Table 5.3 King Supply Makes Four Different Types of Plumbing Fixtures: W

question 26

Multiple Choice

Table 5.3
King Supply makes four different types of plumbing fixtures: W, X, Y and Z. The contribution margins for these products are: $70 for Product W, $60 for Product X, $90 for Product Y and $100 for Product Z. Fixed overhead is estimated at $5,500 per week. The manufacture of each fixture requires four machines, Machines #1, 2, 3 and 4. Each of the machines is available for 40 hours a week and there is no setup time required when shifting from the production of one product to any other. The processing requirements to make one unit of each product are shown in the table. Weekly product demand for the next planning period has been forecasted as follows: 70 Ws, 60 Xs, 50 Ys and 30 Zs.
Table 5.3 King Supply makes four different types of plumbing fixtures: W, X, Y and Z. The contribution margins for these products are: $70 for Product W, $60 for Product X, $90 for Product Y and $100 for Product Z. Fixed overhead is estimated at $5,500 per week. The manufacture of each fixture requires four machines, Machines #1, 2, 3 and 4. Each of the machines is available for 40 hours a week and there is no setup time required when shifting from the production of one product to any other. The processing requirements to make one unit of each product are shown in the table. Weekly product demand for the next planning period has been forecasted as follows: 70 Ws, 60 Xs, 50 Ys and 30 Zs.     In the questions that follow, the traditional method refers to maximizing the contribution margin per unit for each product, and the bottleneck method refers to maximizing the contribution margin per minute at the bottleneck for each product. -Use the information in Table 5.3. Using the bottleneck method, which product should be scheduled first? A)  Fixture W B)  Fixture X C)  Fixture Y D)  Fixture Z
In the questions that follow, the traditional method refers to maximizing the contribution margin per unit for each product, and the bottleneck method refers to maximizing the contribution margin per minute at the bottleneck for each product.
-Use the information in Table 5.3. Using the bottleneck method, which product should be scheduled first?


Definitions:

Income Earns

The compensation received by an individual or generated by an entity in exchange for labor or services or as earnings from investments.

Afford

The financial capacity to purchase something, indicating that the cost does not exceed the buyer’s purchasing power or budget constraints.

Optimum Purchasing

The process of buying goods and services in the most efficient and cost-effective manner, maximizing value for the purchaser.

Sweaters

Garments intended for upper body warmth, traditionally made from wool but now also from synthetic fibers.

Related Questions