____________ is the rearranging of the project network logic so that critical activities are done in parallel rather than sequentially.


Definitions:

Control Limits

Statistical boundaries set in control charts that are used in process control to detect times when a process is out of control or behaving anomalously.

Standard Errors

The standard deviation of the sampling distribution of a statistic, typically the mean.

Control Chart

A control chart is a statistical tool used to monitor, control, and improve process performance over time by identifying sources of variation.

Process Variability

The natural or inherent variations in a process, reflecting the differences in output or results when the process is repeated under the same conditions.