Labour Efficiency Variance
A metric that assesses the difference between the expected amount of labor time to produce a given level of output and the actual labor time used.
Labour Rate Variance
The difference between the actual wage rate paid to workers and the expected (or standard) wage rate, multiplied by the actual hours worked.
Direct Labour Costs
Costs that can be directly attributed to the production of goods or services, such as wages for workers manufacturing a product.
Variable Overhead Spending Variance
The difference between the actual variable overhead costs incurred and the expected costs based on a predetermined standard.
Q10: Arguments in a function are separated by
Q12: It is good practice to store files
Q17: When applying a texture to a slide
Q18: Words or phrases that display in a
Q46: Click the Color button in the _
Q61: Which is NOT a text rotation or
Q74: _ is NOT an option in the
Q84: After the default theme, all other PowerPoint
Q93: Clustered bar charts display categories on the
Q98: Perspective Shadow, White is a picture style.