In setting up a kanban control system and you need to determine the number of kanban card sets needed.If the expected demand during lead time is 50 per hour,the safety stock is 20% of the demand during lead time,the container size is 4.If the lead time to replenish an order is 2 hours,what number of kanban card sets is needed?


Definitions:

Regulatory Policies

Regulatory policies are rules established by governments or regulatory bodies to guide the operation of businesses and organizations, with the aim of protecting public welfare.

Production Possibilities Frontier

A curve depicting all maximum output possibilities for two or more goods given a set of inputs, representing efficiency.

Opportunity Cost

The cost of choosing one alternative over another, represented by the benefit foregone from not choosing the next best alternative.

Inefficient

Referring to a lack of effectiveness, not achieving maximum productivity; resulting in a waste of time, energy, or material.