The process design team at a manufacturer has broken an assembly process into eight basic steps, each with a required time, and predecessor as shown in the table. There are 7.5 productive hours available in a day and the manufacturer wishes to produce 400 units. Balance the line by assigning tasks to workstations to fill up as much takt time as possible. Break ties by assigning the longest task first.
-Refer to the scenario above. Without using more than one worker per station, what is the maximum output achievable in the 7.5 hour work day?
Data Validation
The process of ensuring that a program operates on clean, correct and useful data, through checks and routines.
Data Interpretation
The process of analyzing and making sense of collected data to derive conclusions or insights.
Professional Standards
Guidelines and principles that dictate the ethical and technical expectations of professionals in their field.
PQRST
A mnemonic used in nursing and medicine to assess pain: Provokes, Quality, Radiates, Severity, Time.
Q5: Which type of flexibility would be the
Q24: Wally's Filling Station is manned by one
Q29: Which of the following is not a
Q32: Deductive and inductive research are competing approaches
Q35: The normative nature of the decision-model approach
Q36: Which of the continuous improvement tools is
Q37: A company with fixed costs of $10,000
Q40: Define employee empowerment and process ownership. How
Q40: The use of research in accounting results
Q52: Portfolio analysis begins with assignment to a