Consider the Following Activity-On-Arc Project Network,where the 12 Arcs (Arrows)represent

question 3

Essay

Consider the following activity-on-arc project network,where the 12 arcs (arrows)represent the 12 activities (tasks)that must be performed to complete the project and the network displays the order in which the activities need to be performed.The number next to each arc (arrow)is the time required for the corresponding activity.Consider the problem of finding the longest path (the largest total time)through this network from start (node 1)to finish (node 9),since the longest path is the critical path.Formulate a BIP model for this problem. Consider the following activity-on-arc project network,where the 12 arcs (arrows)represent the 12 activities (tasks)that must be performed to complete the project and the network displays the order in which the activities need to be performed.The number next to each arc (arrow)is the time required for the corresponding activity.Consider the problem of finding the longest path (the largest total time)through this network from start (node 1)to finish (node 9),since the longest path is the critical path.Formulate a BIP model for this problem.


Definitions:

Pectoral Girdle

The structure that attaches the arms to the axial skeleton.

Pelvic Girdle

The structure that attaches the legs to the axial skeleton.

Second Cervical Vertebra

Also known as the axis, it is a bone in the neck that allows the head to rotate.

Process

A series of actions or steps taken to achieve a particular end.

Related Questions