As Long as There Are No Points Outside of the Control

question 92

True/False

As long as there are no points outside of the control limits in a control chart, the process would always be considered to be in control.


Definitions:

Specification Limits

Defined thresholds within which the values of a product, process, or service must fall to meet quality standards.

Pooled Standard Deviation

An estimation of standard deviation that combines two or more groups of data, assuming equal variance across these groups.

Sample Means

The average value derived from a subset of a larger population, used as an estimate of the overall population mean.

Upper Control Limit

The highest threshold in a control chart in statistical process control, beyond which a process output is considered to be out of control and indicative of a problem to be investigated.