ABC Products produces three products (A, B and C) on three machines.Machines 1 and 2 are available for 40 hours a week and Machine 3 is available for 60 hours a week.Profit contribution and standard production time in hours are given in the following table:
Only one operator per machine is required on Machines #1 and #2.Two operators are required for Machine #3.Therefore, two hours of labor must be scheduled for each hour of Machine #3's time.To restate this requirement, two operators must be scheduled for each hour of Machine #3's operation, as well as one operator for each hour of Machine #1's operation and one operator for each hour of Machine #2's operation.A total of 110 labor hours is available for assignment to the three machines during the coming week.Other production requirements are that Product A cannot account for more than 40% of the units produced and that Product C must account for at least 25% of the units produced.
a.Develop the constraint for the capacity limit of Machine #1.
b.Develop the constraint for the capacity limit of Machine #3.
c.Develop the constraint for the labor capacity limit.
d.Develop the constraint for limiting Product A to no more than 40% of the units produced.
e.Develop the constraint that ensures Product C accounts for at least 25% of the units produced.
Doughboys
were the U.S. infantrymen during World War I, known for their role in the European theater of the war.
Trenchfoot
A medical condition caused by prolonged exposure of the feet to damp, unsanitary, and cold conditions, often seen in soldiers in trench warfare.
"Over the Top"
A phrase originally used in World War I to describe an infantry attack that went out of the protection of trenches into no-man's land, often used metaphorically to denote an excessive action.
Middle-Class Volunteers
Individuals from the middle-income group who offer their service for a cause or organization without monetary compensation.
Q3: If Activity C directly precedes both D
Q8: The demand for segment information has been<br>A)
Q8: Assume that a U.S. company has a
Q25: The first step into international business is
Q25: Determine the sample size for the following
Q33: Uncertainty refers to not knowing what will
Q40: In the case of a forward contract
Q52: Which of the following is not a
Q62: In most organizations, projects cut across organizational
Q67: The time to check out guests at