Use these activity durations (that have been estimated at 90%)and precedence requirements to create two project schedules - a traditional schedule based on early start times and a critical chain schedule with buffers.
Perceptual Overload
A condition resulting from the exposure to more information or stimuli than one can effectively process at one time.
Sensory Adaptation
The process by which sensory receptors become less sensitive to constant stimuli over time.
Absolute Threshold
The smallest level of stimulus that can be detected by a sense at least 50% of the time.
Target Stimulus
A specific stimulus aimed at eliciting a particular response in an experimental or learning context.
Q3: The best method for establishing the existence
Q7: Banks have high liquidity needs and therefore,
Q8: The heir to the throne was
Q27: What are three methods of duration estimation
Q44: Given the cost information in the
Q45: Use this resource load chart to determine
Q47: Refer to Exhibit 2-1. What is the
Q67: Use the project described in the
Q68: The project review session was one epiphany
Q76: An important element in critical chain scheduling