Extreme Wreaths,Inc

question 117

Essay

Extreme Wreaths,Inc.makes wreaths in batch sizes of 15 at a time.The cutting & assembly process takes 10 minutes per wreath,and the decorating process time is 7 minutes per wreath.It takes 5 minutes to move the wreaths from the cutting & assembly process to the decorating process.

In a effort to improve the lead time,the company has tried reducing the batch size to 10 units.The new process is as follows: cutting & assembly process - 8 minutes.The decorating process is still 7 minutes per wreath.It takes 5 minutes to move the wreaths from the cutting & assembly process to the decorating process.

(a)Compute the value-added,non-value-added,and the total lead time of the wreath process for both the old and the new manufacturing process.
(b)Compute the value-added ratio for both the old and new process.Round to the nearest decimal.


Definitions:

Enteric Nervous System

A subdivision of the peripheral nervous system that directly controls the gastrointestinal system.

Gut

The gastrointestinal tract that digests food, absorbs nutrients, and expels waste.

Ventral

Pertaining to the front or anterior part of the body in vertebrates or the lower side in humans.

Medial

Situated in or pertaining to the middle; often used to describe the location of structures within the body or brain relative to the midline.

Related Questions