Part of JIT Philosophy Is to Design Operations That Are

question 48

Short Answer

Part of JIT philosophy is to design operations that are highly efficient but flexible in order to accommodate changing ______________________.


Definitions:

Bottleneck Process

A bottleneck process is a stage in production that reduces the efficiency of the operation due to limited capacity, slowing down the overall process flow and impacting productivity.

Activity-Based Costing

A costing method that assigns overhead and indirect costs to related products and services.

Factory Overhead

Costs associated with manufacturing operations that are not directly tied to specific units of production, such as utilities and rent for the manufacturing space.

Activity Rates

Charges or costs assigned to specific activities or cost drivers in activity-based costing, used to allocate overhead.