The Following Table of Probabilistic Time Estimates (In Weeks)and Activity

question 62

Multiple Choice

The following table of probabilistic time estimates (in weeks) and activity predecessors are provided for a project.
The following table of probabilistic time estimates (in weeks) and activity predecessors are provided for a project.    Table 9.2 -Using Table 9.2,the critical path for the project consists of activities A) A-B-C-D-E. B) A-B-C-E. C) A-B-D-E. D) A-B-C-D.
Table 9.2
-Using Table 9.2,the critical path for the project consists of activities


Definitions:

Null Hypothesis

A hypothesis in statistical tests that assumes no effect or no difference between groups or conditions being compared.

Consecutive Weeks

A succession of weeks that occur consecutively without any breaks.

Confidence Interval

A variety of values, based on statistics from a sample, which is conjectured to envelop an obscure population parameter.

P-value

A statistical concept indicating the probability of observing data as extreme as those seen, if the null hypothesis were true, used in hypothesis testing.

Related Questions