Cox Engineering performs cement core tests in its laboratory. The following standards have been set for each core test performed: During March, the laboratory performed 2,000 core tests. On March 1 no direct materials (sand) were on hand. Variable manufacturing overhead is assigned to core tests on the basis of standard direct labor-hours. The following events occurred during March:
• 8,600 pounds of sand were purchased at a cost of $7,310.
• 7,200 pounds of sand were used for core tests.
• 840 actual direct labor-hours were worked at a cost of $8,610.
• Actual variable manufacturing overhead incurred was $3,200.
-The labor efficiency variance for March is:
Q10: The spending variance for power costs in
Q15: The following materials standards have been established
Q18: Division X makes a part that it
Q45: Suppose the selling price of the upgraded
Q81: Leerar Corporation makes a product with the
Q93: Part E43 is used in one of
Q109: When there is a production constraint,a company
Q128: The selling and administrative expenses in the
Q253: The overall revenue and spending variance (i.e.
Q259: The activity variance for selling and administrative