The network below represents a project being analyzed by Critical Path Methods.Activity durations are A = 5,B = 2,C = 12,D = 3,E = 5,F = 1,G = 7,H = 2,I = 10,and J = 6. The network below represents a project being analyzed by Critical Path Methods.Activity durations are A = 5,B = 2,C = 12,D = 3,E = 5,F = 1,G = 7,H = 2,I = 10,and J = 6.   a.What task must be on the critical path,regardless of activity durations? b.What is the duration of path A-B-E-H-J? c.What is the critical path of this network? d.What is the length of the critical path? e.What is slack time at activity H? f.What is the Late Finish of activity H? g.If activity C were delayed by two time units,what would happen to the project duration? a.What task must be on the critical path,regardless of activity durations?
b.What is the duration of path A-B-E-H-J?
c.What is the critical path of this network?
d.What is the length of the critical path?
e.What is slack time at activity H?
f.What is the Late Finish of activity H?
g.If activity C were delayed by two time units,what would happen to the project duration?


Definitions:

Ischial Wound

A pressure sore or ulcer that occurs on the ischium, part of the pelvic bone, often as a result of prolonged sitting or pressure in individuals with limited mobility.

Partial-Thickness Wound

A type of injury where the damage extends through the epidermis and possibly into, but not through, the dermis layer of the skin.

Epidermis

The outermost layer of the skin, serving as a protective barrier against environmental factors.

Peripheral Neuropathy

A condition resulting from damage to the peripheral nervous system, leading to symptoms like numbness, pain, and weakness, primarily in the hands and feet.

Related Questions