An assembly line with 11 tasks is to be balanced.The longest task is 2.4 minutes,the shortest task is 0.4 minutes,and the sum of the task times is 18 minutes.The line will operate for 600 minutes per day.
(a)Determine the minimum and maximum cycle times.
(b)What range of output is theoretically possible for the line?
(c)What is the minimum number of stations needed if the maximum output rate is to be sought?
(d)What cycle time will provide an output rate of 200 units per day?


Definitions:

Operant Conditioning

A method of learning that employs rewards and punishments for behavior, emphasizing the role of reinforcement in shaping actions.

Self-Actualized

The state in which an individual achieves their fullest potential, including creative expression, quest for spiritual enlightenment, pursuit of knowledge, and the desire to give to society.

Physiological Needs

Basic, essential life requirements such as food, water, and shelter that must be met for survival.

Affiliation Needs

The human desire to feel a sense of involvement and belonging within a social group or environment.

Related Questions