A company is trying to balance production between 3 workstations on an assembly line. Currently there are 5 tasks that need to be performed. These tasks, ABCDE, have required times of 2 minutes, 4 minutes, 1 minutes, 3 minutes, and 10 minutes, respectively. The assembly line needs to produce 40 units per day to meet demand and can work for up to 8 hours each day.
(a) What is the required cycle time?
(b) What is the theoretical minimum # of workstations?
(c) Assign the tasks according to the shortest task time heuristic.
Sole Proprietorship
A business owned and operated by a single individual, with no distinction between the business and the owner.
Business Debts
Financial obligations that a business owes to creditors, which can include loans, bonds, and other forms of borrowing.
Liability
A legal obligation or responsibility that can be enforced by law, typically involving debts or financial obligations.
General Partnership
A business structure where two or more individuals share ownership, profits, and liabilities of the business.
Q3: Assignable variation:<br>A)is a sign that a process
Q6: Effective capacity is the:<br>A)maximum output of a
Q9: Lists have been developed that rank countries
Q12: An electronics manufacturer makes remote control devices
Q12: Design capacity is the theoretical maximum output
Q17: The _ is the lowest level of
Q57: List the eight steps used to develop
Q63: Which of the following products is likely
Q74: Recent events suggest that additive manufacturing is
Q75: FedEx chose Memphis,Tennessee,for its central location,or "hub,"