Examlex

Solved

At a New Watch Assembly Plant,a Job Is Divided into Three

question 46

Multiple Choice

At a new watch assembly plant,a job is divided into three work elements.The element times for the first four cycles are recorded by the continuous method and are presented below along with a performance rating factor (RF) for each element. At a new watch assembly plant,a job is divided into three work elements.The element times for the first four cycles are recorded by the continuous method and are presented below along with a performance rating factor (RF) for each element.   The standard time for this job,assuming that the allowance is 18 percent,is: A) fewer than or equal to 1.9 minutes. B) greater than 1.9 minutes but fewer than or equal to 2.0 minutes. C) greater than 2.0 minutes but fewer than or equal to 2.1 minutes. D) greater than 2.1 minutes. The standard time for this job,assuming that the allowance is 18 percent,is:


Definitions:

Binge-And-Purge

A cycling behavior often associated with bulimia nervosa, involving episodes of excessive eating followed by attempts to avoid weight gain through vomiting, using laxatives, or exercising excessively.

Eating Pattern

The habitual intake of food, including what, when, and how much a person eats over time.

Bipolar Disorder

A psychiatric condition characterized by extreme mood swings between mania and depression.

Questionable Financial Venture

An investment or business opportunity that has uncertain or suspicious legitimacy, potentially leading to financial loss or fraud.

Related Questions