Table 7.3 -Using Table 7.3, If the Project Manager Wants at Least

question 100

Multiple Choice

Table 7.3
Table 7.3    -Using Table 7.3, if the project manager wants at least a 98% probability that the project will be completed on or before the due date, what is the shortest project due date that will satisfy the manager? A)  fewer than or equal to 28 days B)  greater than 28 days but fewer than or equal to 30 days C)  greater than 30 days but fewer than or equal to 32 days D)  greater than 32 days
-Using Table 7.3, if the project manager wants at least a 98% probability that the project will be completed on or before the due date, what is the shortest project due date that will satisfy the manager?


Definitions:

Scorpions

Arachnids known for their venomous stings, eight legs, and distinctive extended body with a segmented tail.

Spiders

Arthropods belonging to the class Arachnida, characterized by eight legs, silk-producing spinnerets, and a two-part body consisting of a cephalothorax and abdomen.

Winged Invertebrates

Invertebrate animals that possess wings, allowing them to fly; includes insects and some species of arachnids.

Hymenoptera

An order of insects that includes wasps, bees, and ants, characterized by two pairs of wings and a constriction between the abdomen and thorax.

Related Questions