Examlex
This is a three-part question about critical path calculation. Consider a simple single- cycle implementation of MIPS ISA. The operation times for the major functional components for this machine are as follows:
- Below is a copy of the MIPS single-cycle datapath design. In this implementation the clock cycle is determined by the longest possible path in the machine. The critical paths for the different instruction types that need to be considered are: R-format, Load-word, and store-word. All instructions have the same instruction fetch and decode steps. The basic register transfer of the instructions are:
Fetch/Decode: Instruction <- IMEM[PC];
R-type: R[rd] <- R[rs] op R[rt]; PC <- PC + 4;
Load: R[rt] <- DMEM[ R[rs] + signext(offset)]; PC <- PC +4; store: DMEM[ R[rs] + signext(offset)] <- R[Rt]; PC <- PC +4; (Part B)
Place the latencies of the components that you have decided for the critical path of each instruction in the table below. Compute the sum of each of the component latencies for each instruction.
Physiological Needs
Basic physical requirements for human survival, such as food, water, shelter, and clothing, that are essential to maintaining life.
Self-Actualization Needs
The highest level in Maslow's hierarchy of needs, representing the pursuit of realizing one's own potential and self-fulfillment.
Growth Needs
The desire for personal development, self-improvement, and the realization of one's potential.
McClelland's Theory of Needs
A psychological theory of motivation that asserts individuals are motivated by three primary needs: achievement, affiliation, and power.
Q8: What is a symbol library?
Q13: Write a program that prompts the user
Q21: What is displayed on the console when
Q28: What is a copyright?
Q32: Define parameters.
Q32: Identify a caution to consider when seeking
Q39: Give another name for computer numerical control
Q62: The rule or principle that states that
Q97: Define keyseat.
Q125: Give the typical contents of stainless steel.