Examlex
A newly hired administrator is tasked to change the number of CPUs assigned to a VM. Which of the following if the FIRST step the administrator should do during a scheduled maintenance window?
De-energized
The state of an electrical device or system when it is not supplied with power or electricity, often as a safe condition for maintenance or setup.
TOF Timer
A timing function that begins timing when the input signal goes from true to false, often used in programmable logic controllers (PLCs).
Accumulate Time
A process in computing or control systems where elapsed or total time for events is recorded or added together.
Time Delay
An intentional latency inserted in a signal path or operational sequence to regulate the flow of information or synchronization of tasks.
Q18: Which of the following DR testing scenarios
Q35: An engineer, who is conducting a penetration
Q54: An administrator is looking to apply a
Q82: A penetration tester has compromised a host.
Q158: Which of the following BEST describes some
Q379: Which of the following steps in the
Q394: Which of the following commands displays the
Q592: A user calls the system administrator and
Q680: An organization has determined it can tolerate
Q957: A company's user lockout policy is enabled