Management Wants to Design an Assembly Line That Will Turn

question 152

Essay

Management wants to design an assembly line that will turn out 800 adult games per day.There will be eight working hours in each day.The industrial engineering staff has assembled the information below:
Management wants to design an assembly line that will turn out 800 adult games per day.There will be eight working hours in each day.The industrial engineering staff has assembled the information below:    Determine the maximum and minimum cycle times. (i)Determine the optimum cycle time. (ii)What is the minimum number of stations needed? (iii)Draw the precedence network. (iv)Assign tasks to stations in order of most following tasks first. Determine the maximum and minimum cycle times.
(i)Determine the optimum cycle time.
(ii)What is the minimum number of stations needed?
(iii)Draw the precedence network.
(iv)Assign tasks to stations in order of most following tasks first.


Definitions:

Quantitative Data

Data that can be quantified and verified, usually numerical in nature, used in statistical analysis to identify patterns, trends, and relationships.

Social Psychologists

Scientists who study how people's thoughts, feelings, and behaviors are influenced by the actual, imagined, or implied presence of others.

Ecological Validity

The extent to which the findings of research studies can be generalized to real-world settings.

Nonobviousness

Nonobviousness refers to a criterion used in patent law to determine whether an invention is sufficiently innovative to warrant patent protection, indicating it is not obvious to someone with ordinary skill in the relevant field.

Related Questions