Given the network diagram above,determine each of the following:
(i)the activities which are on the critical path
(ii)the expected project duration
(iii)the probability that the project will be completed in 29 weeks or less
(Note:
the numbers on each node refers to the expected duration and standard deviation in weeks for that activity.
E.G., 8,2 indicates an expected duration of eight and a standard deviation of two weeks.)
Cover Message
A written communication sent along with another document (such as a resume) to provide additional information or to introduce oneself.
Job Interview
A formal meeting between a job applicant and an employer or panel, aimed at evaluating the applicant's suitability for a position.
Cover Message
A letter or message that accompanies and introduces another document, such as a résumé, explaining its purpose or relevance.
Visual Résumé
A visual résumé presents an individual's professional background and skills through creative and graphical elements, such as charts, images, and infographics, rather than through a traditional text-based format.
Q30: Typically customers will perceive waiting times to
Q32: Of the following,which is not strictly a
Q35: Using the product-tree shown,determine the following:<br>(i)the quantity
Q45: From focus groups,3M noticed consumers needed an
Q56: Manufacturability,i.e.ease of fabrication or assembly,is a key
Q64: For a server that already has a
Q70: Using the EOQ model,the higher an item's
Q84: Which of the following are advantages of
Q101: Time series techniques involve identification of explanatory
Q103: A random pattern of errors within the